High River Downtown Area Redevelopment
OBJECTIVES
In the aftermath of the 2013 floods, damage to infrastructure required a complete replacement of utilities, resulting in significant excavation of existing streets. Despite the unprecedented destruction, the fortitude of the community remained. Long-term solutions were needed to ensure that economic and cultural vitality was restored and improved.
SOLUTIONS
The immediate need to respond to the flood’s aftermath laid the groundwork for the development of long-term solutions. Utilities downtown required complete replacement, resulting in significant excavation of the existing streetscape.
RESULTS
The new streetscape design successfully cultivates an improved visitor experience and a positive environment for local business. Economic redevelopment is supported by wide sidewalks using pavers that allow spill-out activities from businesses into the street. These pavers also provided vehicular calming measures, which are implemented throughout the core as well, reducing traffic speeds and increasing pedestrian safety.
Team
Owner: Town of High River
Designer: O2 Planning + Design
Producer: Barkman Concrete
Installer: Pro Paving Stones
Links
For more information, visit https://www.barkmanconcrete.com/case/town-of-high-river/#top.